Yuejiang Company's 2016 Unit 1 blower rotor repair project tender announcement

    The tender number: 0724-1600C24N4232
    Tender code: CBL_20161115_29412682
    Bulletin category: Domestic tender

    Tenderee: Guangdong Shaoguan Yuejiang Power Generation Co., Ltd. Source of Funding: Other Yuejiang Company's 2016 Unit 1 Blower Rotor Unit Maintenance Project Tender Notice Project Name: Yuejiang Company's 2016 Unit 1 Blower Rotor Unit Maintenance Project (hereinafter referred to as "project")
    The tender number: 0724-1600C24N4232
    Date: November 16, 2016
    1. Under the entrustment of Guangdong Shaoguan Yuejiang Power Generation Co., Ltd. (hereinafter referred to as the “Tenderee”), we invited the potential bidders interested in Yuejiang Group's 2016 1 unit blower rotor group overhaul maintenance project The abbreviation "Bidder" applies for registration according to the requirements of this invitation.
    2. Project overview and tender scope:
    2.1 Project Overview:
    Shaoguan Power Plant is located in Wushi Town, Qujiang District, Shaoguan City, Guangdong Province. The factory area is bordered by Beijiang River in the south, Beijing-Guangzhou Railway Line is on the east, Qujiang District is about 23km north, and Shaoguan City is 37km. The factory location is excellent and the traffic is convenient.
    2.2 The scope of the tender:
    Yuejiang Company No. 1 unit primary fan rotor group sent to the factory maintenance services.
    For details, please refer to the tender document "Technical Conditions Book."
    3. Eligibility requirements for eligible bidders:
    3.1 Basic Requirements (1) The bidder shall be a legal entity in the People's Republic of China within the territory of the People's Republic of China in response to bids, competitions in bidding, or overseas enterprises, and shall have independent legal personality and power to conclude contracts.
    (2) The bidder must be a service provider capable of fulfilling the tender content requirements and providing bid invitations and services.
    (3) Bidders who are legally and financially independent, operate in accordance with commercial law and are independent of bidders and bidders can participate in bids.
    (4) The equipment provided by the Bidder for this project shall be similar to or more restrictive than the conditions of this project. It can provide documents and documents for the production of technical and major equipment required for performance of the contract, and provide the ability to perform contract equipment. Project installation guidance, commissioning, maintenance, repairs and other service obligations and experience documents.
    (5) Two or more legal persons whose legal representative is the same person, parent company, wholly-owned subsidiary company and its holding company shall not bid at the same time in the same goods bidding. Under the above circumstances, the bidder only accepts the bidder with the lowest bid, and the remaining bids are disposed of as waste.
    (6) The Bidder shall not have any direct or indirect connection with the consulting company or its affiliates entrusted by the Tenderee for the procurement of the goods for which this Tender is to be drafted, the preparation of specifications and other documents.
    (7) Bidders have good bank credit and business reputation, are not being ordered to suspend business or bankruptcy, and assets have not been reorganized, taken over and frozen.
    3.2 Performance Requirements The bidder has at least 1 similar performance to the project. No major equipment quality problems were found in the installation, commissioning and operation of similar equipment.
    The performance shall be the bidder's, not its parent company, partner or technical supporter; the bidder shall provide at least the contract agreement, the contract information clearly showing the scope of the contract, the commissioning certificate (or user certificate, if the equipment Has been put into operation). And the bidder's performance certificate provided by the contractor or user certificate should clearly show the project name, scope of supply, quantity and model, and require the official seal of the bidder.
    If the tenderer requests, the bid applicant must provide the original for the tenderer to verify the qualification (performance) certification documents provided by him. The information provided must be true and complete. If any fraudulent or concealed condition is found, it will be cancelled by the tender supervision department. The tenderer reserves the right to publicize the bidder’s qualifications and performance provided.
    4. The procedures for obtaining bids and bidding documents are as follows:
    Bid registration (with application registration information) - submit qualified registration information - purchase tender documents Special Note: The bidder must submit qualified registration information, and received a notice from the bidding agency, in order to receive the tender documents and Pay the bidding documents fee.
    1) Price of Bidding Documents: Further Notice
    2) Time of sale: further notice

    Contact: Zhang Jie

    Mobile:

    phone

    fax

    E-mail:

    In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.

    Gel Battery

    Gel Battery,Gel Cell Battery,Gel Battery For Car,Gel Type Battery

    Power X (Qingdao) Energy Technology Co., Ltd. , https://www.solarpowerxx.com

    Previous Post: Sharp 70-inch 4K Internet TV Review: Older manufacturers have Internet thinking
    Next Post: Cool open A2 series television has become a new synonym for high-end domestic products.
    Home
    Recent Posts
    • PS VR has another major ç‘•ç–µ Sony PS VR can no…
    • EMC study of RF circuits and antennas
    • Simple and practical - Peng life smart camera li…
    • Apple AirPods official version evaluation: the f…
    • The mobile VR user came, the Android version of …
    • Machine learning implementation relies on data
    • How fast is Faraday's world's first prod…
    • 2017CES Sony will push 4K OLED TV! Although late…
    • Why is this pure electric Minivan going beyond t…
    • Cool open 55N2 TV new how?
    • TCL's LED lighting sales accounted for 40% o…
    • Millet Google Announces Collaboration with Andro…
    • Wireless Bluetooth Speaker Selection Tips
    • No longer exclusive "Robinson: Journey"…
    • Sounded the robot industry "charge"
    • Breaking through the high temperature problem 60…
    • Di graceful special network set-top box broadcas…
    • Smart TV build family KTV boutique karaoke appli…
    • How much is the Starbucks cup? Why is the smart …
    • Heavy taste VR games on the shelves of favor, th…